Circular route around Lake Bled is passable again, the partial closure at Mlino will be temporarily lifted

25.04.2024 | News

Pločnik na Mlinem© Petra Pekovec

The construction of the pavement close to Lake Bled at Mlino is now complete, making the circular route around Lake Bled passable and safe again. During the May Day holidays (from 26 April until 5 May), the traffic on the road next to the pavement at Mlino will run both ways. On 6 May, the construction work will resume on that road (section between the port for pletna boats of Mlino and Villa Beli dvor near the tunnel). The partial closure of the road will be controlled by traffic lights, alternating one-way traffic.